CEE for Guinea-Bissau: when must it be validated?
Once the CEE reference for Guinea-Bissau is issued, the original bill of lading must follow within 5 days, or the certificate is cancelled.
Once the CEE reference for Guinea-Bissau is issued, the original bill of lading must follow within 5 days, or the certificate is cancelled.
Following the 08/08/2011 directive, you have 5 days after receiving the CEE (CEE) reference to forward the original Bill of Lading with place and date of issue and shipped-on-board date, signed and stamped.
All destinations
Angola (ARCCLA)
Benin (BESC)
Burkina Faso (ECTN)
Burundi (BESC)
Cameroon (BESC)
Central African Republic (BESC)
Chad (BESC)
Djibouti (ECTN)
DR Congo (FERI)
Egypt (ACID)
Equatorial Guinea (FESO/ECTN)
Gabon (BIETC)
Gambia (ECTN)
Ghana (SPN)
Guinea (Conakry) (BESC)
Ivory Coast (BSC)
Kenya (ACD)
Liberia (BESC)
Madagascar (BSC)
Mali (BESC)
Niger (BESC)
Republic of the Congo (ECTN)
Senegal (BSC)
Sierra Leone (CTN)
Somalia (ECTN)
South Sudan (ECTN)
Sudan (ACD)
Togo (BESC)
Yemen (ACD)

