Skip to content

Cargo tracking note

How to get D.R. Congo FERI? Complete guide.

By CTN Certificate4 min read

Last updated: November 2026

Cargo for the Democratic Republic of Congo is discharged at Matadi or Boma, and its FERI should be approved before the vessel enters DRC territorial waters.

Democratic Republic of Congo is also called D.R. Congo or D.R.C.

For businesses importing into D.R.C, securing a FERI (Fiche Electronique des Renseignements a l’Importation) is a must step. In simple words, it’s an Electronic Cargo Tracking Note.

The FERI is an electronic import information sheet managed by the Office de Gestion du Fret Multimodal (OGEFREM), and it is linked to the importer’s FXI licence. In this complete guide, we will take you through the step-by-step process of acquiring a D.R.C FERI: the authority behind it, the ports it covers, the documents and what each must show, the FXI/GUICE reference, and the approval deadline before the vessel reaches DRC waters.

D.R.C’s FERI is also known as BSC, BESC, ECTN, or CTN.

Democratic Republic of Congo flag - FERI cargo tracking note

Understanding the Essence of FERI

The FERI is required by OGEFREM for goods destined for D.R.C. through the seaports of Matadi and Boma. This electronic cargo tracking note records the import before arrival, and each FERI is tied to the importer through the FXI licence, so the importer’s FXI details have to be in place before the application.

FERI certificates should be approved up to 5 days before the vessel enters DRC territorial waters, which is tracked from the manifest. For that reason we recommend applying right after departure, and we recommend that the FERI number be written on the bill of lading.

Step 1- Compiling Essential Documentation

The D.R.C FERI is prepared from the shipping documents below and the importer’s FXI reference. A draft bill of lading is enough to start:

  1. Bill of Lading (B/L): Issued by the carrier; a draft is enough to start. We recommend that the FERI number be written on it.
  2. Commercial Invoice: The seller’s invoice for the goods, showing what is imported into D.R.C. and its value.
  3. Freight Invoice: The invoice for the sea freight to Matadi or Boma.
  4. FXI Number: It needs to be provided by the importer. FXI is a reference number that is provided to importers when they open their Import license. A valid FXI/GUICE reference is required for the FERI.
  5. FDI Document: Listed among the documents for the FERI; include it with the application.
  6. Packing List: Packages, weights and contents of the shipment.
  7. Export Customs Declaration: Filed in the country of loading.

Step 2- Hiring Authorized Consultant like us

Now you need to hire an officially recognized consultant like us at ctncertificate.com. We collect the FXI/GUICE reference from the importer, check the shipping documents against each other, prepare the FERI application and follow it through approval, so the FERI number can be passed on for the bill of lading. Learn more about the benefits of outsourcing CTN services and how to choose the right provider.

Step 3- Application Submission

The application is submitted once the importer’s FXI/GUICE reference is confirmed as valid and the shipper, consignee, cargo description, weight and value read the same on the bill of lading, commercial invoice, packing list and export declaration. Check the FXI/GUICE reference with the importer before submission.

Apply right after the vessel departs, so there is time for approval before the vessel enters DRC territorial waters.

Step 4- Document Scrutiny and Validation

OGEFREM reviews the application against the documents and the importer’s FXI licence. If a question comes back, it is answered with corrected or supporting documents before approval continues.

The vessel’s position is tracked from the manifest, so delays at this stage reduce the time left before the vessel reaches DRC waters.

Step 5- FERI Issuance

After approval OGEFREM issues the FERI for the shipment to Matadi or Boma. We recommend writing the FERI number on the bill of lading and keeping the certificate with the shipment documents.

The FERI is linked to the importer’s FXI licence, so check that the importer details on the documents match the FXI licence.

FERI Processing Timeframe

We provide draft FERI the same day depending on submission. The final FERI certificate depends on how complete the documents are, whether the FXI/GUICE reference is valid when the application is submitted, and the authority’s workload. Plan for approval up to 5 days before the vessel enters DRC territorial waters.

Penalties and Adherence

The two points to watch are the approval window, up to 5 days before the vessel enters DRC territorial waters, and the FXI/GUICE reference, which has to be valid. Apply right after departure, confirm the FXI/GUICE reference with the importer, and write the FERI number on the bill of lading. Read about the top 20 mistakes to avoid when obtaining a cargo tracking note.

Shipping to Neighboring Countries?

If you are also shipping to countries near D.R. Congo, you may need similar certificates. Check out our guides for Republic of Congo ECTN, Angola CNCA, Burundi ECTN, and Central African Republic ECTN.

Are you ready to get your D.R.C FERI?

Get Free Quotation

Get the certificate before the vessel sails

Choose the destination, add your documents and apply online. We follow the file until the certificate is validated.

Start the application

30destination countries

Reply within an hour, draft the same day

Chat on WhatsApp