Cargo tracking note
How to get Republic of Congo ECTN? A complete guide.
Cargo discharged at Pointe-Noire, the seaport of the Republic of the Congo, needs an electronic cargo tracking note that is validated with the Conseil Congolais des Chargeurs (CCC).
First, let’s differentiate between Democratic Republic of Congo (DRC) and Republic of Congo. This article is about Republic of Congo not DRC.
For importers importing into the Republic of Congo’s market, securing an ECTN (Electronic Cargo Tracking Note) is a must step. On ctncertificate.com it is listed as the Republic of the Congo ECTN, an electronic tracking note for the port of discharge.
The ECTN records the shipment to Pointe-Noire and is built from the shipping documents of that shipment. In this complete guide, we will take you through the step-by-step process of acquiring a Republic of Congo ECTN: the authority behind it, the port it covers, the required documents, the time limits after the vessel departs and the notice that changed how corrections are handled.
Republic of Congo ECTN is also known as CTN, BESC, or BSC.

Understanding the Essence of ECTN
The Republic of Congo ECTN is required by the Conseil Congolais des Chargeurs (CCC), the shippers' council of the Republic of the Congo. It covers shipments discharged at the port of Pointe-Noire.
The ECTN number is issued at validation, so it cannot be given in advance to a carrier or a consignee. The authority does not require the ECTN number on the master bill of lading, but some carriers ask for it, so check the carrier's instructions before the bill of lading is issued. The dates also matter: validation is linked to the vessel's departure and onboard date, as explained in the penalties section below. Service details for this certificate are on our Republic of the Congo ECTN page.
Step 1- Compiling Essential Documentation
The Republic of Congo ECTN is prepared from the documents below. A draft bill of lading is enough to start, but the details on every document have to describe the same shipment:
- Bill of Lading (B/L): Issued by the carrier; a draft is enough to start. It shows the shipper, consignee, cargo description, weight and the port of discharge, Pointe-Noire.
- Commercial Invoice: The seller’s invoice for the goods, showing what is shipped, its value and the payment terms.
- Freight Cost: The invoice for the sea freight to Pointe-Noire, with the freight charges and related costs.
- GUOT (Guichet Unique Opérationnel des Transports): The GUOT number is a unique identifier assigned to each transport operation. It’s a key element in the ECTN application process, linking your cargo to the tracking system.
- Export Customs Declaration: Filed in the country of loading. It is not required for shipments loading in the USA.
Step 2- Hiring Authorized Consultant like us
Now you need to hire officially recognized consultant like us at ctncertificate.com. We check the documents against each other, prepare the Republic of Congo ECTN application and follow it with the CCC until the ECTN number is issued at validation. We also keep track of the vessel's departure and onboard dates, because the time limits for validation run from them.
Step 3- Application Submission
The application is submitted once the shipper, consignee, cargo description, weight and value read the same on the bill of lading, the commercial invoice and the freight invoice, and, where it applies, the export customs declaration. Check these details across the documents before submission.
Submit as soon as the vessel has departed. Validation requested more than 3 calendar days after the vessel departs is charged at a higher rate, so late paperwork adds cost.
Step 4- Document Scrutiny and Validation
The application is checked by the Conseil Congolais des Chargeurs (CCC). If a question comes back, it is answered with corrected or supporting documents before validation continues.
Plan corrections early. Since 1 September 2024, a validated ECTN for the Republic of the Congo can only be corrected while the shipment’s ETA has not been reached. See the notice: Republic of the Congo: ECTN corrections only before the vessel’s ETA.
Step 5- ECTN Issuance
After validation the Republic of Congo ECTN is issued with its ECTN number. This is the first point at which the number exists, so pass it on to the carrier only after validation if the carrier asks for it on the bill of lading.
Keep the certificate with the shipment documents for Pointe-Noire, and check it against the final bill of lading before the vessel’s ETA, while a correction is still possible.
ECTN Processing Timeframe
We provide draft ECTN the same day depending on submission. The final certificate depends on how complete the documents are when they are submitted and on the authority’s workload. Because the charge rises after 3 calendar days from departure and a penalty applies after 5 days from the onboard date, start the application before the vessel sails.
Penalties and Adherence
If the certificate is not validated within 5 days after the onboard date, authorities will assess a penalty in addition to the certificate fees. Separately, the ECTN costs more when validation is requested more than 3 calendar days after the vessel departs. A validated ECTN can only be corrected before the vessel’s ETA, so check every detail before that date. Our Republic of the Congo ECTN page and the notice on corrections before the ETA give the background.